Energy National Electrical System Rehabilitation — PMURR Programme
Emergency rehabilitation of the DRC's electrical system: 5 hydro plants (2,200 MW), transmission networks and 8 distribution networks in major cities.
Energy, water, infrastructure and consulting — discover AGC's hands-on experience since 1990.
Energy Emergency rehabilitation of the DRC's electrical system: 5 hydro plants (2,200 MW), transmission networks and 8 distribution networks in major cities.
Energy
Improving Brazzaville's power supply: substation rehabilitation, LV network densification and public lighting.
Energy
Restoring service to the 1954 plant (3 Francis turbines, 750 kW) to supply the town of Kailo, plus a feasibility study for extension to Kindu.
Energy
Rehabilitation of the 5 MW plant and associated networks: 100 km of 30 kV line, 21 MV/LV substations and 276 km of LV networks for the town of Kindu.
Energy Rehabilitation of Inga 1 & 2, a new 400 kV Inga–Kinshasa line, a new 100 MVA Kimbanseke HV substation, and extension of Kinshasa's distribution network.
Energy Exporting 500 MW to Southern Africa: rehabilitation of the 500 kV HVDC Inga–Kolwezi line (1,700 km), 2 converter stations, 4 switching stations.
Energy
Feasibility study for the international power link connecting the Inga complex (DRC) to Cabinda (Angola) and Pointe-Noire (Republic of Congo).
Energy
Study for the construction of a 110 kV transmission line and a transformer substation between Boundji and Ewo in the Republic of Congo.
Energy
Monitoring and control of the construction works for the power transmission network associated with the Imboulou hydroelectric plant.
Energy Full supervision of the construction of the largest hydroelectric plant in the Republic of Congo, including control of civil, electromechanical works and testing.
Energy
Control and supervision of the construction works for the 64 MW Grand Katende hydroelectric plant in the Democratic Republic of Congo.
Energy Technical and economic feasibility study of 69 identified hydropower sites in Rwanda, including associated transmission networks.
Energy
Feasibility studies of three hydroelectric plants in eastern DRC to strengthen Maniema's power grid.
Energy
Technical and economic feasibility study of the Liouesso hydroelectric plant in the Republic of Congo and its transmission works.
Energy
Development of technical studies and specifications for the construction of the Bitale hydroelectric plant in South Kivu and its associated networks.
Energy Supervision of the electrification of Cuvette, Cuvette Ouest, Plateaux and Pool, starting almost from scratch in each department.
Energy
HV connection of the agro-industrial park and electrification of surrounding villages via a 220 kV line and a 70 MVA 220/33 kV substation.
Energy
Comparative study of electrification techniques for riverside villages: capacitive, inductive and solar tapping.
Energy
Study for the construction of the 30 kV line connecting substation C to Mbamou island and the 30/20 kV transformer substation in the Brazzaville department.
Energy
Quality review of the DRC's peri-urban and rural electrification project studies, covering technical, economic and environmental aspects.
Energy
Electrification studies for 60 rural villages in Rwanda through 200 kW mini hydropower plants.
Energy
Feasibility study on providing modern energy services via hydropower plants to 100 pilot villages in Rwanda.
Energy
Construction of 11 residential PV systems for the decentralised electrification of Cité du Fleuve in Kindu, Maniema province.
Energy
Installation of PV systems at the hospitals of Kyondo, Musienene and Masereka to secure power supply in rural areas.
Energy
Construction of a 12 kWp solar plant for the autonomous power supply of the Institut Supérieur de Hautes Technologies in Kindu.
Energy
Installation of a PV system to provide standby power for the educational resource centre in the Kenge sub-division, Kwango province.
Water Rehabilitation and extension of the drinking water network: 107,000 m³/day pumping station, 6.9 km DN 1,000 pipeline, 3 reservoirs (15,000 m³) and a 4.8 MW hydropower plant.
Water
Extension and rehabilitation of the drinking water network: 52 km of pipelines, 3,000 household connections, 145 public standpipes and a 2,000 m³ reservoir.
Water
Drinking water supply to the Lumbu-Lumbu district: two 12 m water towers, 162 m³ composite reservoirs and a PPR distribution network.
Infrastructure Supervision of the paving of 115 km connecting Obouya to Okoyo via Boundji, linking to the Congolese national road network.
Infrastructure
Supervision of the construction of 110 km of paved road linking Okoyo to the Gabonese border, with control of earthworks and pavement.
Infrastructure
Feasibility and detailed design studies for paving the Boundji–Ewo section of RP 32, including environmental impact assessment and tender documents.
Infrastructure
Supervision of the construction of a PV panel manufacturing plant in Oyo: 6,682 m² of built area, 50 MW/year production capacity.
Consulting
Diagnostic of SNE's information system and installation of 55,000 meters in Brazzaville and Pointe-Noire with computerised mapping.
Consulting
Full sector diagnostic (SNE, SCPE, ANER, ARSEL, FDSEL) and reform proposals to open the sector to private investors.
Consulting
Support in selecting a private operator for the delegated management contract of Régideso, the DRC's national water utility.
Consulting
Analysis of production costs, electricity generation forecasting and design of a financial model for SCPE (Société Congolaise de Production d'Énergie).
Consulting
Sector support to the Republic of Congo's Ministry of Energy and Water Resources for the development of the high-voltage grid code.
Consulting
Full audit of Régideso's information system covering administrative, financial, commercial and technical functions.
Consulting
Technical and financial audit of the construction works for the Kakobola hydroelectric plant, currently underway.
Consulting
Identification of SNE's MV and LV customers in Brazzaville (35,000 meters) and Pointe-Noire (20,000 meters), with computerised network mapping.