For over 30 years, AGC has supported public project owners and international funders in the planning, design and supervision of water and transport infrastructure across Central Africa.
From source to tap, from track to viaduct: our assignments cover the entire project cycle, meeting the standards required by the World Bank, AfDB and KfW.
for Mbuji-Mayi, Uvira, Kindu
for networks and structures
per funder procedures
Six disciplines serving water and territorial development.
Feasibility studies, preliminary and detailed design for drinking water supply systems: intake, treatment, storage and distribution. Expertise in urban and rural networks in tropical settings.
Design of sewer networks, treatment plants and stormwater drainage systems. Integration of environmental and public-health requirements from the feasibility stage.
Owner's Engineering, preliminary design and works supervision for the rehabilitation and construction of provincial roads, rural tracks and urban roadways. Experience with AFD, World Bank and AfDB financing.
Geotechnical survey campaigns, result interpretation and recommendations for the foundations of hydraulic structures, buildings and transport infrastructure.
Design and supervision of hydraulic structures, bridges, culverts and box culverts along Central Africa's road corridors. FIDIC verifications and funder reporting included.
Continuous site presence, HSQE quality control, progress measurement and management of non-conformances. Monthly reports compliant with institutional funder requirements.
What we have already delivered.
Update of feasibility and detailed design studies, environmental impact assessment, preparation of technical specifications and tender documents. Pumping station with 8 pump units, 6.9 km DN 1,000 main, primary network, three reservoirs.
See the project →Rehabilitation and extension of the drinking water supply network for the town of Uvira. Production capacity increased to 520 m³/h, new 2,000 m³ reservoir, nearly 52 km of pipelines, 3,000 household connections and 145 public standpipes.
See the project →Water supply system study, supervision of drilling works, construction of two 12 m water towers, installation of composite reservoirs, laying of 6.9 km of DN 1,000 pipe, primary and secondary PPR networks.
See the project →Owner's Engineering for the rehabilitation of the provincial road in the Republic of Congo. Quality control, progress measurement, compliance verification and funder reporting per FIDIC procedures.